Specification

Product description

This is a modern, three-phase AC charging station with a maximum power of 22 kW, designed for both home and commercial use. The station is equipped with a universal Type 2 (IEC 62196-2) socket, ensuring compatibility with most electric vehicles available in Europe.

Extensive connectivity — Ethernet, WiFi, 4G, and Bluetooth — and the EVSE Master mobile app provide full control over the charging process from anywhere.

Key features and benefits:

Type 2 socket — the user connects their own Type 2 cable, ensuring compatibility with virtually every electric vehicle available in Europe.

Advanced connectivity — support for Ethernet, WiFi, 4G, and Bluetooth for remote control and monitoring of the station via a mobile app.

App control — full control over charging, schedule setting, power adjustment, and statistics review.

Power adjustment — ability to charge at 3.6 kW / 7.2 kW / 11 kW / 22 kW depending on the installation and needs.

LED indicator — intuitive signaling of the station's current operating status.

Power cable included — approx. 1m 3-phase 400V cable ready for connection to the electrical system.

Safety features — built-in RCD Type A + 6mA DC, undervoltage and overvoltage protection, overload, short-circuit, leakage current, overheating, and lightning protection.

Durable casing — IP66 ingress protection and IK10 mechanical resistance allow for indoor and outdoor installation.

Technical data:

Parameter Value
Max AC power 22 kW
Phases 3-phase (400V)
Connector Type 2 socket (IEC 62196-2)
Vehicle cable None — Type 2 cable required
Power cable Yes — approx. 1m, 3-phase 400V
Maximum current 32A
Connectivity Ethernet, WiFi, 4G, Bluetooth
Control EVSE Master mobile app
Indicator LED
Protection RCD Type A + 6mA DC
Ingress Protection IP66
Mechanical resistance IK10
Catalog number BS30-BA-22KW-APP
Installation Wall-mounted / post
Application Indoor / Outdoor
Station type

Specifies where and how the station is mounted and what its purpose is.

  • Wallbox (wall-mounted) — mounted directly on the wall, ideal for a garage or parking space
  • Freestanding post — mounted on a dedicated post, e.g., outside a building or in a parking lot
  • Portable — mobile charger, can be plugged into a standard socket or a reinforced circuit
  • Public station — designed for use by many users, e.g., in commercial car parks
Charging level

Determines the speed and type of electric vehicle charging.

  • Level 1 (AC 230V) — slow charging via a standard household socket, up to 2.3 kW
  • Level 2 (AC 400V) — faster home or business charging, from 3.6 kW to 22 kW — the most popular choice
  • Level 3 (DC) — fast direct current charging from 50 kW upwards, charges a car to 80% in 20–40 minutes
Manufacturer

The brand that designed and manufactured the charging station.

  • Arinea / Ultron — Polish manufacturer, DC and AC stations for businesses and public charging points
  • Circontrol — Spanish manufacturer with 30 years of experience, home and commercial charging stations
  • Besen — Premium manufacturer at a good price, home charging stations with a mobile application
  • Wallbox — Leading European manufacturer of smart chargers with design and app
  • Delta — Global manufacturer of DC fast charging stations for public use
Color

Charging station casing color.

  • White — universal, fits any environment, the most popular choice for home use
  • Black — elegant, modern look, recommended for garages and company parking lots
  • Gray — neutral, discreet, often used in commercial spaces
Phase type

Specifies the electrical requirements of the installation and the maximum charging power.

  • Single-phase (1×230V) — up to 7.4 kW, a standard outlet or dedicated circuit is sufficient, simple and inexpensive installation
  • Three-phase 11 kW (3×16A) — faster charging, requires a three-phase connection, a good choice for home and business
  • Three-phase 22 kW (3×32A) — maximum AC power, for heavily used vehicles and fleets
  • DC (direct current) — from 50 kW, fastest charging, requires specialized installation

Key product features

  • Ładowanie w domu

  • 22 kW

  • Besen

  • Czarny

  • Trójfazowy

  • Nowy

FAQ

— frequently asked questions

How to pass an electromobility audit?

An electromobility audit requires an assessment of a building's electrical installation. Our team will help you through the entire process — from technical assessment to selecting the appropriate charging station.

Can the housing community forbid me from installing a charging station?

The community cannot completely prohibit installation, but it may require consent. We assist in preparing documentation and communicating with the community.

How quickly can I charge my car with a Wallbox?

Charging time depends on the model of the charging station and battery capacity. A 7.4 kW station will charge most electric cars in 6–8 hours, while a 22 kW station can do it in as little as 2–3 hours.

Who can install a charging station?

Installation may only be carried out by a qualified electrician. Wallbox cooperates with certified installers throughout Poland – we can recommend a specialist in your area.

Does the charging station work in all weather conditions?

Yes – our stations are IP54/IP65 certified, which means full protection against rain, snow and dust. They operate flawlessly all year round.

Product comparison

Input voltage

400V AC

Input voltage

230V AC

Input voltage

DC

Connector

Type 2 Cable · 6 m

Connector

Type 2 Cable · 5 m

Connector

CCS + CHAdeMO

Communication

Bluetooth + Wi-Fi (EVSEMaster app)

Communication

Wi-Fi · Bluetooth · Ethernet · OCPP 1.6

Communication

OCPP 1.6 · Wi-Fi · Ethernet

RFID

No (APP version)

RFID

Yes

RFID

Yes

Assembly

Wall-mounted

Assembly

Wall-mounted

Assembly

Detached

Destiny

Home / Company

Destination

Home / Company

Destination

Public / Commercial station

Courier delivery

Contact us

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.