What charger do I need?

We charge electric cars with alternating current (AC) or direct current (DC). For home use, we always choose an AC station — the car's onboard charger determines the maximum charging speed.
3.7 kW AC – Slow 8–12 hours Overnight charging
Standard socket or basic wallbox. Sufficient for everyday use at low mileage.
11 kW AC – Fast 3–5 hours Best choice for home
Best cost-to-performance ratio. Most cars support 11 kW AC.
22 kW AC – Maximum 1.5–3 hours For cars with 22 kW charger
Only a few models accept full 22 kW AC.
50–350 kW DC – Fast 15–45 minutes Public stations on the road
DC charging directly to the battery. For public use only.

How much will charging cost?

Enter your car parameters and check charging time and cost.
Your car and station Set parameters below
Battery capacity 60 kWh
Station power 11 kW
Energy price 0,52
Charging time
Energy drawn
Charging cost

Which connector to choose?

In Poland and Europe there are two main AC connector standards.
Standard Power Region EU req. Recommended
Schuko / CEE
regular socket
up to 3.7 kW Europe No No
Type 2
EU standard since 2014
up to 22 kW Europe Yes Yes

Tethered cable or socket?

Home stations come in two versions — with a cable or a Type 2 socket.
🔌
Tethered (Mode 3) Fixed cable Convenient for home — walk up and plug in without looking for a cable.
🔗
Type 2 socket Socket + own cable Flexible for multiple users or different cars. Cable stored in the boot.

What does installation look like?

From order to first charge — typically 5–7 working days.
1
Free online quoteFill in the form, describe the installation location. We respond within 24 h.
2
Electrical auditOur installer assesses the installation, fuse box and cable run distance.
3
Station and accessories selectionWe recommend a model matched to your car and budget.
4
Installation and commissioningA certified electrician installs the station, performs measurements and starts it up.
5
Support and warrantyYou receive documentation, a subsidy invoice and a service number.

How much does a charging station cost?

Indicative gross prices including installation.
Basic stationfrom 1,500 PLNSimple wallboxes 3.7–7.4 kW without display or management.
11 kW station2,500–4,000 PLNMost popular choice. WiFi, RFID, OCPP.
22 kW station3,500–5,500 PLNFor cars supporting 22 kW AC.
Installation600–1,500 PLNDepends on cable run length and installation condition.
My Electricity subsidyup to -1,400 PLNHome charging station subsidy programme.
Net costfrom ~1,700 PLNAfter deducting the My Electricity subsidy.

Frequently asked questions

Answers to questions we get most often before purchase.
Does every EV charge at 11 kW? +
No. Charging speed is limited by the vehicle's on-board charger. The station will not exceed the car's own limit.
Do I need a building permit? +
For a single-family home installation, a permit is usually not required. Our installer will guide you through any requirements.
How long does installation take? +
The installation itself takes 2–4 hours. From order to commissioning — typically 5–7 working days.
Can I get a subsidy? +
Yes. The My Electricity 5.0 programme offers up to 1,400 PLN subsidy for a home charging station.
Does the station work without internet? +
Yes — offline charging always works. Internet is needed for remote management and updates.

We invite you to contact us!

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.