12 Arteva stations, 24 charging points – successful UDT inspection
Arinea has completed the installation of 12 Arteva charging stations, each with two charging points — a total of 24 points. The project was concluded with a successful inspection by the Office of Technical Inspection (UDT). 🤩
We would like to thank everyone involved in the project for their excellent work and support in finalizing the details. It was a demanding project, and such a positive UDT inspection result is the best confirmation of the quality of the entire team's work.



Udostępnij:
Two 200 kW charging stations for PowerDot – Stara Iwiczna
Wallbox Stellar DC – osiedle przy ul. Moniuszki, Strzelce Opolskie