Charging stations for PowerDot in Stara Iwiczna

Arinea has completed the supply and installation of two electric vehicle charging stations with a total power output of 200 kW for PowerDot Sp. z o.o. The stations were installed at ul. Nowa 4 in Stara Iwiczna. ⚡

The project included [selection of power and station configuration / electrical and connection work / commissioning and configuration of the charging management system — adjust to what was actually done].

We are pleased to have been part of this project, supporting the development of publicly accessible charging infrastructure in Poland.

Leave a comment

Please note, comments need to be approved before they are published.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

From the world of electromobility

View all

Wallbox Stellar DC – osiedle przy ul. Moniuszki, Strzelce Opolskie

Wallbox Stellar DC – osiedle przy ul. Moniuszki, Strzelce Opolskie

Lokalizacja: ul. Moniuszki (osiedle), Strzelce OpolskieData realizacji: 2026Wykonawca: Arinea Szybka stacja ładowania Wallbox Stellar DC na osiedlu w Strzelcach Opolskich Arinea zrealizowała dostawę i uruchomienie szybkiej stacji ładowania pojazdów elektrycznych Wallbox Stellar DC na osiedlu przy ul. Moniuszki w Strzelcach...

Read moreabout Wallbox Stellar DC – osiedle przy ul. Moniuszki, Strzelce Opolskie

12x Arteva z pozytywnym odbiorem UDT

12x Arteva with positive UDT acceptance

Arinea has completed the installation of 12 Arteva charging stations (24 charging points) with positive UDT approval.

Read moreabout 12x Arteva with positive UDT acceptance

Dwie stacje ładowania 200 kW dla PowerDot – Stara Iwiczna

Two 200 kW charging stations for PowerDot – Stara Iwiczna

Arinea completed the delivery and installation of 2 charging stations with a total capacity of 200 kW for PowerDot Sp. z o.o. in Stara Iwiczna.

Read moreabout Two 200 kW charging stations for PowerDot – Stara Iwiczna