Location and implementation details
Location: Dopiewo Municipal Services Plant
Date of completion: 2026
Performer: Arinea
Construction of an Enelion Wallbox Duo Power charging station for the Dopiewo Municipal Services Plant
Arinea has installed an electric vehicle charging station Enelion Wallbox Duo Power on the premises of the Municipal Services Plant in Dopiewo. The investment was made to service the fleet of vehicles used in daily municipal operations.
The station used enables simultaneous charging of two electric vehicles , which significantly increases the efficiency of infrastructure use and allows for optimal use of the available connection power.
What did the implementation include?
1. Installing an AC charging station
-
Station installation Enelion Wallbox Duo Power
-
Two charging points in one device
-
A solution designed for intensive fleet use
-
Installation in the technical facilities of the facility
2. Comprehensive turnkey implementation
-
Selecting the right device for the needs of a municipal facility
-
Installation of the power supply
-
Installation of charging stations and accessories
-
Start-up and testing of the system's correct operation
3. Safety and compliance
-
Dedicated switchboard and electrical protection
-
Installation in accordance with applicable standards and regulations
-
Preparing the infrastructure for further expansion of the electric vehicle fleet
Summary
The implementation for the Municipal Services Plant Dopiewo shows that Electromobility is also increasingly being implemented in the public and municipal services sector . The use of charging stations Enelion Wallbox Duo Power enables efficient, safe and effective charging of electric vehicles used in the plant's daily operations.




Share:
Construction of the ABB Terra AC charging station – Warsaw, Topiel Street 18
Implementation of electric bus charging infrastructure for the Włocławek District