Location and implementation details
Location: Warsaw, Topiel Street 18
Date of completion: 2026
Performer: Arinea
Construction of the ABB Terra AC charging station at 18 Topiel Street in Warsaw
Arinea has installed an electric vehicle charging station ABB Terra AC in a facility located at 18 Topiel Street in Warsaw. The project was carried out in the building's underground garage and is part of the development of modern electromobility infrastructure in urban development.
The ABB Terra AC station used is a proven premium solution, dedicated to everyday use by residents or users of the facility, with an emphasis on safety, reliability and aesthetics of the installation.
What did the implementation include?
1. Installing an AC charging station
-
Station installation ABB Terra AC
-
AC charging adapted to the building infrastructure
-
Compact housing and modern design
-
Installation in the underground garage space
2. Comprehensive turnkey implementation
-
Selecting the appropriate technical solution
-
Installation of the power supply
-
Installation of charging stations and accessories
-
Start-up and operation testing
3. Safety and compliance
-
Dedicated switchboard and electrical protection
-
Installation in accordance with applicable standards and technical requirements
-
Preparing the infrastructure for possible further expansion
Summary
The implementation at 18 Topiel Street in Warsaw confirms that Electric vehicle charging stations are increasingly becoming a standard in modern residential and commercial buildings . ABB Terra AC provides users with convenient and safe charging of electric vehicles at the parking lot.




Share:
Arinea installed an Enelion wallbox in Krakow
Enelion Wallbox Duo Power charging station