Location and implementation details

Location: KRUS Białystok
Date of completion: 2026
Performer: Arinea

Construction of an ABB Terra AC 22 kW charging station for the Agricultural Social Insurance Fund (KRUS) in Białystok

Arinea has installed an electric vehicle charging station ABB Terra AC Wallbox with a power of 22 kW , equipped with clear user screen for the branch of the Agricultural Social Insurance Fund in Białystok.

The station was installed in a locked, dedicated technical cabinet , which ensures a high level of security, protection of the device against external conditions and convenience of everyday use.

What did the implementation include?

1. Installing an AC charging station

  • Station installation ABB Terra AC Wallbox 22 kW

  • Built-in screen for easy operation and control of the charging process

  • Intended for use in a public institution facility

2. Technical cabinet and ease of use

  • Installing the station inside lockable housing

  • Convenient opening and closing of the wardrobe

  • Protecting the device against unauthorized access

  • Aesthetic and orderly cable management

3. Comprehensive turnkey implementation

  • Selecting the appropriate technical solution

  • Installation of the power supply

  • Installation of stations, accessories and safety devices

  • Start-up and testing of the system's correct operation

4. Safety and compliance

  • Dedicated switchboard and electrical protection

  • Installation in accordance with applicable standards and regulations

  • A solution prepared for many years of failure-free operation

Summary

Realization for KRUS in Białystok shows that the charging infrastructure for electric vehicles can be simultaneously safe, functional and aesthetic . Application of the station ABB Terra AC 22 kW with screen , installed in a locked technical cabinet, ensures convenient charging and full control over access to the device.

From the world of electromobility

View all

3 stacje ładowania FLOW-E – garaż podziemny, ul. Towarowa 45, Poznań

3 FLOW-E charging stations – underground garage, 45 Towarowa Street, Poznań

Arinea completed the delivery and installation of three FLOW-E charging stations in the underground garage at 45 Towarowa Street in Poznań. Each station is assigned to a separate parking space.

Read moreabout 3 FLOW-E charging stations – underground garage, 45 Towarowa Street, Poznań

Stacja ładowania Delta Slim 50 kW – ul. Wyszyńskiego 10, Myszków

Delta Slim 50 kW charging station – 10 Wyszyńskiego Street, Myszków

Arinea has completed the delivery and installation of a Delta Slim 50 kW DC fast-charging station at 10 Wyszyńskiego Street in Myszków. Two marked EV charging spaces are now available to drivers.

Read moreabout Delta Slim 50 kW charging station – 10 Wyszyńskiego Street, Myszków

Stacja ładowania ARTEVA AC 44 kW dla Golden Star – Kraków, siedziba Shell

ARTEVA 44 kW AC charging station for Golden Star – Kraków, Shell headquarters

Arinea completed the delivery and installation of an ARTEVA AC 44 kW charging station for Golden Star at Shell's headquarters in Kraków. Two 22 kW charging points with RFID access for office building employees and visitors.

Read moreabout ARTEVA 44 kW AC charging station for Golden Star – Kraków, Shell headquarters