Location: KRUS Płock, 09-402 Płock, ul. Otolińska 25
Completion date: 2026
Contractor: Arinea
Implementation of the Circontrol eHome5 22 kW charging station for KRUS in Płock
Arinea installed a Circontrol eHome5 22 kW electric vehicle charging station, equipped with a Type 2 socket and an RFID reader, for the Agricultural Social Insurance Fund (KRUS) in Płock, at ul. Otolińska 25.
The chosen solution was selected for use in a public facility, where access control, safety, and reliability are key.
What did the implementation include?
1. Installation of an AC charging station
-
Installation of the Circontrol eHome5 22 kW station
-
Type 2 socket enabling flexible use
-
RFID reader ensuring access control
-
Designed for intensive use in an institutional facility
2. Comprehensive "turnkey" implementation
-
Selection of appropriate equipment for a public institution
-
Execution of the power supply installation
-
Assembly, configuration, and commissioning of the station
-
Tests of system functionality and safety
3. Safety and compliance with standards
-
Dedicated switchgear and electrical protections
-
Installation compliant with applicable standards and requirements for public facilities
-
Preparation of infrastructure for potential future expansion
Summary
The implementation for KRUS in Płock demonstrates that electric vehicle charging infrastructure is becoming a standard also in public administration. The Circontrol eHome5 22 kW station with RFID enables safe, controlled, and efficient charging of electric vehicles used by the institution.
➡ Planning the installation of an EV charging station in an institution or company?
Contact us – we will prepare a solution tailored to your facility.