3 Arinea Ultron X charging stations at Transgór Trzebinia
We are pleased to announce the completion of another electric vehicle charging infrastructure installation. At the Transgór plant in Trzebinia, we installed 3 fast Arinea Ultron X charging stations – a reliable solution for demanding business clients.
Why Arinea Ultron X?
Ultron X is a Polish high-power DC/AC fast charging station with full support for fleet management systems:
- DC Power: 2 × 50–180 kW (CCS) | AC Power: 22 kW (Type 2)
- OCPP 1.6 – integration with charging management systems
- RFID reader – access control and authorization
- GSM modem – remote monitoring and diagnostics
Thanks to dual CCS connectors, each station can simultaneously serve two vehicles – which is crucial in a fleet environment.
Planning charging stations for your company?
We handle the entire process – from design and installation to commissioning. Contact us and book a free technical consultation.
Wallbox – Your partner in electromobility



Share:
Circontrol eHome5 22 kW charging station – KRUS Płock
Który wallbox wybrać do domu? Przewodnik i ranking najlepszych ładowarek EV 2026